Fleet LandingRiverside
Impact glass, top to bottom, on a senior living tower on the St. Johns River.

02The envelope
0ft²
Glazed systems · E.S. Windows, Oct 26, 2026
- Window wall
- 0 frames
- ES-7000, ES-8860 and ES-WW1032, unitized
- Doors
- 0 leaves
- 26 ES-9000 entrance, 230 ES-EL300 French
- Railing
- 0 ln ft
- ES-RL3030 aluminum and glass railing

03Exterior enclosure · Design Guidelines §J
- Basic wind speed
- 0 mph
- 3-second gust · Exposure D
- Sightlines
- 0.0″
- 7″ deep, confirmed in DD
- Water test
- 0 psf
- ASTM E331 and AAMA 501.1
- Air leakage
- 0.00 cfm/ft²
- ASTM E283
- Risk Category II, with Risk Category III as an alternate
- Roller shade pockets built into the window wall
041CG proposal · E.S. Windows systems
1 / 7A01ES · ESW
ES-WW1032
Window wall
LMISMIVerified- Design load
- ±185 psf
- Frame depth
- 10½″ laminated
- 11¼″ insulating
- Maximum size
- 60 × 192″
On this project
Window wall- Units
- 86 frames
- Area
- 5,443 SF
- Build
- 11¼″ insulating
Large/small missile impact resistant unitized window wall.
- Design pressure · needs +40 / −70 psf±185 psf
- Water · needs 12 psf21 psf
Data Oct 29, 2026
1 / 4A02 · A05ES · ESW
ES-8860
Window wall
LMISMIHVHZVerified- Design load
- ±90 psf
- Frame depth
- 7″
- Maximum size
- 50½ × 175″ panel
On this project
Window wall- Units
- 517 LMI · 600 SMI frames
- Total area
- 53,551 SF
Large/small missile impact resistant unitized window wall, in an LMI and an SMI build.
- Design pressure · needs +40 / −70 psf±90 psf
- Water · needs 12 psf17.1 psf
Data Oct 29, 2026
1 / 24A04ES · ESW
ES-7000
Window wall
LMISMIVerified- Design load
- ±150 psf
- Frame depth
- 6⅛″
- Maximum size
- 48 × 144″
On this project
Window wall- Units
- 3,993 frames
- Area
- 147,021 SF
Large/small missile impact resistant unitized window wall.
- Design pressure · needs +40 / −70 psf±150 psf
- Water · needs 12 psf15 psf
Data Oct 29, 2026
1 / 24A03ES · ESW
ES-9000
Commercial entrance door
LMISMIProject source- Design load
- ±120 psf
- Frame depth
- 5″
- Maximum size
- 47 × 110½″ single
- 89 × 110½″ pair
On this project
Entrance doors- Units
- 7 single · 13 double
- Leaves
- 26
- Area
- 829 SF
Out-swing, ADA threshold. Butt hinges, mechanical panic device, lever handles back to back, thumb turn and keyed cylinder, piles, gaskets.
- Design pressure · needs +40 / −70 psf±90 psf
- Water · needs 12 psf18 psf
Data Jul 14, 2026
A06ES · Elite
ES-EL300
French door
LMIVerified- Design load
- ±80 psf
- Frame depth
- 4″ frame
- 1¾″ panel
- Maximum size
- 39¾ × 108″ single
- 76 × 108″ pair
On this project
French doors- Units
- 230 single
- Area
- 6,318 SF
Out-swing, ADA threshold. Standard bottom rail, butt hinges, queen lever set, gaskets.
- Design pressure · needs +40 / −70 psf±80 psf
- Water · needs 12 psf12 psf
Data Oct 29, 2026
1 / 2A07ES · Prestige
ES-P252
Operable window
LMISMIVerified- Design load
- +95 / −105 psf
- U-value
- 0.37
- SHGC
- 0.23
Frame color · 9
On this project
Casements- Units
- 296
- Area
- 4,790 SF
Thermally broken casements. Multipoint lock, 4-bar hinge, limit devices, thermal break bars, gaskets.
- Design pressure · needs +40 / −70 psf+95 / −105 psf
- Water · needs 12 psf17.1 psf
Data Oct 29, 2026
1 / 13A14ES · ESW
ES-RL3030
Glass railing
Verified- Design load
- ±120 psf
- Maximum panel
- 61½ W × 44 H″
- Glass
- 7/16″ laminated
On this project
Balcony railing- Height
- 42″
- Length
- 5,831 LF
Segmented post-to-post railing with spandrel glass.
Data Oct 29, 2026
Also supplied
- Glass slab cover for the ES-8860 window wall (A08) · 1,163 SF
- Break metal to cover steel at the double-height lobby · 634 LF
- Break metal corners over 90° · 3,072 LF
- Break metal for the gap between window wall jambs · 1,286 LF
- 5LSH louvers as infill · 433 SF
Performance
- All systems finished in 3-coat standard finish, AAMA 2605
- Design pressure ±40 psf (zone 4) and +40/−70 psf (zone 5), per sheet S0.007
- Basic wind speed per final structural engineering
- Exposure B · Risk Category II
- Deflection L/175 or ¾″ max up to a 13′-6″ span; L/240 + ¼″ over 13′-6″
- Large missile impact from ground level to 30 ft; small missile from 30 ft up
- Engineered, project-specific shop drawings and calculations included
Warranties
- 1 yrWorkmanship
- 5 yrFinish
- 5 yrMetal
- 10 yrGlass, low-e coating and IGU seal
051CG plan · E.S. Windows quote ARJ-026-040
From the ES plant in Barranquilla to 111 Riverside Avenue, one floor at a time.
- 01 · Façade contractor1CG
Shop drawings and calcs, the install sequence, logistics tracking, mock-up, installation and closeout.
- 02 · SupplierE.S. Windows
Frames, glass, finish and assembly in one plant in Barranquilla. Ships pre-glazed units, delivered to Jacksonville.
- 03 · General contractorThe GC
Site access, delivery booking, crane and hoist time, laydown and the other trades.
- 04 · ReviewDesign team
Gensler, Walter P Moore, WJE and Lerch Bates review submittals, interfaces and façade access.
Plant to floor
One line from award to handover. Each dot is a gate; nothing moves past it until it closes. Order 5–7 months before the first close-in.
- 01Award
Order placed
Price per the quote; the window opens for shop drawings and the mock-up.
25% deposit - 02Shop drawings
Drawings approved
1CG drawings and calcs, submitted twice for approval and once for record.
25% at release - 03Before fabrication
Sequence locked
Floor by floor, elevation by elevation, agreed with the GC. ES cuts glass and packs containers to it.
25% at release - 0416–24 weeks
Built in Barranquilla
Frames, glass, finish and assembly in one plant. Units inspected, filmed and racked by floor.
- 0516 km
Port of Barranquilla
Containers leave per floor release, in install order.
15% at shipment - 06≈ 3 days
By sea to Florida
ES confirms the Florida port for each release.
- 07Booked slot
Riverside Avenue
Every rack checked and photographed, then lifted to its floor.
10% at delivery - 08Floor by floor
Set the window wall
Check the slab, set sill and head, set and interlock the units, anchor and seal, cover the slab edge.
- 09Closeout
Handover
Field water tests, punch list, record drawings, approvals and warranties.
Deliver at the install pace
- Call off containers per floor release, booked with the GC.
- Agree where containers park and unload, and the crane or hoist time to lift them.
- Every rack carries its floor, elevation, unit marks and weight.
- Check and photograph every rack on arrival; isolate damage for ES.
- Stock only the current floor, by the openings, within the floor loading.
The order on site
- Window wallLowest released floor upward; hoist runs and crane tie-ins are the only leave-outs.
- Entrance doorsLate, at the base, into the ES-7000 door adaptor.
- French doors, casementsFloor by floor behind the window wall.
- RailingAfter the window wall, at the balcony edges and roof.
Safety
- Edges open one or two bays at a time, inside a 15 ft zone with personal fall arrest.
- Every lift: qualified signaler, real rack weights; picks stop at the wind limit and for lightning.
- Hurricane season, June 1 to November 30: secure staged racks per the GC's storm plan; hold shipments into a storm.
- OSHA 30 crew, daily task briefings, weekly safety meetings.
Quality
- Mock-up built and tested before the units that depend on it are released.
- ES checks dimensions, glass build, sealant cure and finish before shipping.
- Every rack checked against its packing list; held units kept apart.
- Floor inspections and field water tests, recorded by unit mark.
Close before the first shipment
- Container planESContainers per release, rack sizes and weights, Florida port
- Laydown and stagingGCWhere containers park and unload, and for how long
- Crane and hoistGC · Lerch BatesEquipment, hours, capacity, tie-ins, leave-outs
- A01 jumbo glassES · 1CGPacking, flatbed and handling
- Storm planGC · 1CGSecuring staged racks, holding shipments
- Mock-up1CG · design teamLocation, test dates, dependent releases
A plan, not an engineered lifting plan or ES's schedule. ES confirms dates at production release; laydown, crane and hoist are confirmed with the GC.

06Schematic design views
Schematic design views at golden hour. Keep scrolling to walk around it.
01 · At the Riverwalk
Re-rendered from the SD set. The drawings govern.






07Program summary · Sep 30, 2026
0
- 0Independent living84%
- 0Assisted living10%
- 0Memory support6%
- Interior
- 0
- gross square feet
- Balconies & terraces
- 0
- exterior square feet
- Parking
- 0
- square feet · 326 spaces
08Floor by floor
Garage P1–P6
Garage and wrap
A six-level precast garage with 326 spaces, wrapped in homes on P3–P6, with retail, a bike shop and the marketing office at the street.