Fleet Landing Riverside at sunset across the St. Johns River

Fleet LandingRiverside

Impact glass, top to bottom, on a senior living tower on the St. Johns River.

Fleet Landing Riverside seen from the south across the river at sunrise

0ft²

0 frames
ES-7000, ES-8860 and ES-WW1032, unitized
0 leaves
26 ES-9000 entrance, 230 ES-EL300 French
0 ln ft
ES-RL3030 aluminum and glass railing
Looking up the west face of the tower

0 mph
3-second gust · Exposure D
0.0″
7″ deep, confirmed in DD
0 psf
ASTM E331 and AAMA 501.1
0.00 cfm/ft²
ASTM E283
  • Risk Category II, with Risk Category III as an alternate
  • Roller shade pockets built into the window wall

  • ES-WW1032 window wall frame render
    1 / 7A01

    ES · ESW

    ES-WW1032

    Window wall

    LMISMIVerified
    Design load
    ±185 psf
    Frame depth
    10½″ laminated
    11¼″ insulating
    Maximum size
    60 × 192″

    On this project

    Window wall
    Units
    86 frames
    Area
    5,443 SF
    Build
    11¼″ insulating

    Large/small missile impact resistant unitized window wall.

    • Design pressure · needs +40 / −70 psf±185 psf
    • Water · needs 12 psf21 psf

    Data Oct 29, 2026

  • ES-8860 window wall frame render
    1 / 4A02 · A05

    ES · ESW

    ES-8860

    Window wall

    LMISMIHVHZVerified
    Design load
    ±90 psf
    Frame depth
    7″
    Maximum size
    50½ × 175″ panel

    On this project

    Window wall
    Units
    517 LMI · 600 SMI frames
    Total area
    53,551 SF

    Large/small missile impact resistant unitized window wall, in an LMI and an SMI build.

    • Design pressure · needs +40 / −70 psf±90 psf
    • Water · needs 12 psf17.1 psf

    Data Oct 29, 2026

  • ES-7000 window wall frame
    1 / 24A04

    ES · ESW

    ES-7000

    Window wall

    LMISMIVerified
    Design load
    ±150 psf
    Frame depth
    6⅛″
    Maximum size
    48 × 144″

    On this project

    Window wall
    Units
    3,993 frames
    Area
    147,021 SF

    Large/small missile impact resistant unitized window wall.

    • Design pressure · needs +40 / −70 psf±150 psf
    • Water · needs 12 psf15 psf

    Data Oct 29, 2026

  • ES-9000 impact entrance door render
    1 / 24A03

    ES · ESW

    ES-9000

    Commercial entrance door

    LMISMIProject source
    Design load
    ±120 psf
    Frame depth
    5″
    Maximum size
    47 × 110½″ single
    89 × 110½″ pair

    On this project

    Entrance doors
    Units
    7 single · 13 double
    Leaves
    26
    Area
    829 SF

    Out-swing, ADA threshold. Butt hinges, mechanical panic device, lever handles back to back, thumb turn and keyed cylinder, piles, gaskets.

    • Design pressure · needs +40 / −70 psf±90 psf
    • Water · needs 12 psf18 psf

    Data Jul 14, 2026

  • ES-EL300 outswing French door
    A06

    ES · Elite

    ES-EL300

    French door

    LMIVerified
    Design load
    ±80 psf
    Frame depth
    4″ frame
    1¾″ panel
    Maximum size
    39¾ × 108″ single
    76 × 108″ pair

    On this project

    French doors
    Units
    230 single
    Area
    6,318 SF

    Out-swing, ADA threshold. Standard bottom rail, butt hinges, queen lever set, gaskets.

    • Design pressure · needs +40 / −70 psf±80 psf
    • Water · needs 12 psf12 psf

    Data Oct 29, 2026

  • ES-P252 outswing casement window render
    1 / 2A07

    ES · Prestige

    ES-P252

    Operable window

    LMISMIVerified
    Design load
    +95 / −105 psf
    U-value
    0.37
    SHGC
    0.23

    Frame color · 9

    On this project

    Casements
    Units
    296
    Area
    4,790 SF

    Thermally broken casements. Multipoint lock, 4-bar hinge, limit devices, thermal break bars, gaskets.

    • Design pressure · needs +40 / −70 psf+95 / −105 psf
    • Water · needs 12 psf17.1 psf

    Data Oct 29, 2026

  • ES-RL3030 glass railing render
    1 / 13A14

    ES · ESW

    ES-RL3030

    Glass railing

    Verified
    Design load
    ±120 psf
    Maximum panel
    61½ W × 44 H″
    Glass
    7/16″ laminated

    On this project

    Balcony railing
    Height
    42″
    Length
    5,831 LF

    Segmented post-to-post railing with spandrel glass.

    Data Oct 29, 2026

Also supplied

  • Glass slab cover for the ES-8860 window wall (A08) · 1,163 SF
  • Break metal to cover steel at the double-height lobby · 634 LF
  • Break metal corners over 90° · 3,072 LF
  • Break metal for the gap between window wall jambs · 1,286 LF
  • 5LSH louvers as infill · 433 SF

Performance

  • All systems finished in 3-coat standard finish, AAMA 2605
  • Design pressure ±40 psf (zone 4) and +40/−70 psf (zone 5), per sheet S0.007
  • Basic wind speed per final structural engineering
  • Exposure B · Risk Category II
  • Deflection L/175 or ¾″ max up to a 13′-6″ span; L/240 + ¼″ over 13′-6″
  • Large missile impact from ground level to 30 ft; small missile from 30 ft up
  • Engineered, project-specific shop drawings and calculations included

Warranties

  1. 1 yrWorkmanship
  2. 5 yrFinish
  3. 5 yrMetal
  4. 10 yrGlass, low-e coating and IGU seal

From the ES plant in Barranquilla to 111 Riverside Avenue, one floor at a time.

  1. 1CG

    Shop drawings and calcs, the install sequence, logistics tracking, mock-up, installation and closeout.

  2. E.S. Windows

    Frames, glass, finish and assembly in one plant in Barranquilla. Ships pre-glazed units, delivered to Jacksonville.

  3. The GC

    Site access, delivery booking, crane and hoist time, laydown and the other trades.

  4. Design team

    Gensler, Walter P Moore, WJE and Lerch Bates review submittals, interfaces and façade access.

Plant to floor

One line from award to handover. Each dot is a gate; nothing moves past it until it closes. Order 5–7 months before the first close-in.

  1. Award

    Order placed

    Price per the quote; the window opens for shop drawings and the mock-up.

    25% deposit
  2. Shop drawings

    Drawings approved

    1CG drawings and calcs, submitted twice for approval and once for record.

    25% at release
  3. Before fabrication

    Sequence locked

    Floor by floor, elevation by elevation, agreed with the GC. ES cuts glass and packs containers to it.

    25% at release
  4. 16–24 weeks

    Built in Barranquilla

    Frames, glass, finish and assembly in one plant. Units inspected, filmed and racked by floor.

  5. 16 km

    Port of Barranquilla

    Containers leave per floor release, in install order.

    15% at shipment
  6. ≈ 3 days

    By sea to Florida

    ES confirms the Florida port for each release.

  7. Booked slot

    Riverside Avenue

    Every rack checked and photographed, then lifted to its floor.

    10% at delivery
  8. Floor by floor

    Set the window wall

    Check the slab, set sill and head, set and interlock the units, anchor and seal, cover the slab edge.

  9. Closeout

    Handover

    Field water tests, punch list, record drawings, approvals and warranties.

Deliver at the install pace

  • Call off containers per floor release, booked with the GC.
  • Agree where containers park and unload, and the crane or hoist time to lift them.
  • Every rack carries its floor, elevation, unit marks and weight.
  • Check and photograph every rack on arrival; isolate damage for ES.
  • Stock only the current floor, by the openings, within the floor loading.

The order on site

  1. Window wallLowest released floor upward; hoist runs and crane tie-ins are the only leave-outs.
  2. Entrance doorsLate, at the base, into the ES-7000 door adaptor.
  3. French doors, casementsFloor by floor behind the window wall.
  4. RailingAfter the window wall, at the balcony edges and roof.

Safety

  • Edges open one or two bays at a time, inside a 15 ft zone with personal fall arrest.
  • Every lift: qualified signaler, real rack weights; picks stop at the wind limit and for lightning.
  • Hurricane season, June 1 to November 30: secure staged racks per the GC's storm plan; hold shipments into a storm.
  • OSHA 30 crew, daily task briefings, weekly safety meetings.

Quality

  • Mock-up built and tested before the units that depend on it are released.
  • ES checks dimensions, glass build, sealant cure and finish before shipping.
  • Every rack checked against its packing list; held units kept apart.
  • Floor inspections and field water tests, recorded by unit mark.

Close before the first shipment

  1. Container planESContainers per release, rack sizes and weights, Florida port
  2. Laydown and stagingGCWhere containers park and unload, and for how long
  3. Crane and hoistGC · Lerch BatesEquipment, hours, capacity, tie-ins, leave-outs
  4. A01 jumbo glassES · 1CGPacking, flatbed and handling
  5. Storm planGC · 1CGSecuring staged racks, holding shipments
  6. Mock-up1CG · design teamLocation, test dates, dependent releases

A plan, not an engineered lifting plan or ES's schedule. ES confirms dates at production release; laydown, crane and hoist are confirmed with the GC.

Fleet Landing Riverside, at the riverwalk

Schematic design views at golden hour. Keep scrolling to walk around it.

Fleet Landing Riverside, from the east
02

Fleet Landing Riverside, from riverside avenue
03

Fleet Landing Riverside, from the wrap balconies
04

Fleet Landing Riverside, from the adjacent lot
05

Fleet Landing Riverside, up the northeast corner
06

Fleet Landing Riverside, up the west face
07

0

  • 0Independent living84%
  • 0Assisted living10%
  • 0Memory support6%
0
gross square feet
0
exterior square feet
0
square feet · 326 spaces

Garage and wrap

A six-level precast garage with 326 spaces, wrapped in homes on P3–P6, with retail, a bike shop and the marketing office at the street.

Fleet Landing Riverside from the river at sunset, a sailboat passing

Fleet Landing Riverside